Front Sway Bar Installation CompleteAdded context on part sourcing after a few questions in the comments.
Engine rebuild complete tonightDecent tolerances, some minor surface roughness to address before dyno testing next week.
Brakes all sorted outGot everything dialed in with the Bremo AP's and now she should stop like a pro on the mountain.
Engine Management System UpdateReplaced the ECU with a newer model that should bring some much-needed boost and refinement to the track car's performance.
Rear Subframe Replaced TodayFinally managed to get the subframe out and in without any issues, all was smooth and straightforward on the extraction and installation.
Rear Differential Rebuild DoneProgress notes updated — see the attached work entries for the full log.
Pedals and Brake BalanceGot the brake balance sorted tonight, now to get the pedal feel just right for the track tomorrow morning.
Rear Subframe Swapped OutHad to replace that old sub with a newer one, still running into some clearance issues though.
Suspension sorted today nowLowering kit fitted, valving tweaked, and the car feels solid and predictable on the track.
Suspension sorted at lastRides are finally level, the rest will be a breeze now that we've got a solid base to work with.
Cooling System Swapped TodayRan into some issues with the radiator fan electrical system but got everything sorted in under two hours.